Fri, 10 Sep 2010 11:29:11 +0100 Johan Groth Bug 3679
Thu, 09 Sep 2010 13:28:40 +0100 Dario Sestito Upload of build info to bit db should be controlled by sf.spec.publish.enable
Wed, 08 Sep 2010 13:54:46 +0100 Dario Sestito Add brag determination in a separate hlm call
Fri, 03 Sep 2010 11:53:15 +0100 Simon Howkins Create RCL_1 branch, for work on releasing PDK 2.0.3 RCL_1
Mon, 06 Sep 2010 11:03:19 +0100 Simon Howkins Backed out changeset: 3698c6929ff1
Fri, 03 Sep 2010 10:28:57 +0100 Maciej Seroka Introduced new helium properties (sf.spec.test.image.location and sf.spec.test.image.name)
Thu, 02 Sep 2010 14:53:02 +0100 Maciej Seroka Changed result file name in Phonebook test plan
Thu, 02 Sep 2010 13:32:47 +0100 Dario Sestito Account for total number of releasables when translating uh to brag and to Diamonds
Thu, 02 Sep 2010 12:45:43 +0100 Brendan Donegan Merge
Thu, 02 Sep 2010 12:43:31 +0100 Brendan Donegan Merge
Thu, 02 Sep 2010 12:17:04 +0100 William Roberts Allow for a layer called "adapt" as an alternative to "adaptation"
Thu, 02 Sep 2010 09:22:38 +0100 Maciej Seroka Updated Speed Dial test to use TestFramework.ini
Wed, 01 Sep 2010 15:03:56 +0100 Maciej Seroka Added new version of ConnSet BC tests
Wed, 01 Sep 2010 14:58:37 +0100 Chetan Kapoor Merge He 9 Fix
Wed, 01 Sep 2010 14:00:09 +0100 Brendan Donegan Run Speed Dial tests with engineini option
Wed, 01 Sep 2010 10:06:34 +0100 Maciej Seroka Moved Connpref to ipconnmgmt
Wed, 01 Sep 2010 10:03:50 +0100 Maciej Seroka Updated BaseSVS and WebSrv BC tests
Tue, 31 Aug 2010 17:54:08 +0100 andy simpson updated baseline for tip_pbc builds to symbian4_FCL.single.821
Tue, 31 Aug 2010 15:28:38 +0100 Chetan Kapoor Merge He 9 Fix
Fri, 27 Aug 2010 17:52:32 +0100 Maciej Seroka Added BC tests for SMS Utilities and Extended Connection Pref
Thu, 26 Aug 2010 16:34:29 +0100 Maciej Seroka Added Device Type (Winscw) for metadatasrv and cenreponotifyhandler test plans
Thu, 26 Aug 2010 14:03:44 +0100 Maciej Seroka Separated CenRepNotifyHandler from SystemSW test suite
Thu, 26 Aug 2010 12:45:10 +0100 Chetan Kapoor Merge He 9 Fix
Thu, 26 Aug 2010 12:39:14 +0100 Maciej Seroka Added central_repository_notification_handler to SystemSW BC test suite
Thu, 26 Aug 2010 12:40:56 +0100 Chetan Kapoor Merge He 9 Fix
Wed, 25 Aug 2010 16:49:00 +0100 Maciej Seroka Implemented downloading result files in XML Extensions BC test suite
Wed, 25 Aug 2010 15:12:23 +0100 Chetan Kapoor Merge He 9 Fix
Wed, 25 Aug 2010 14:48:31 +0100 Maciej Seroka Added BC tests for Location Triggering, Metadata Services and XML Extensions
(0) -1000 -300 -100 -50 -28 +28 +50 tip